Concrete slabs and pads
From shed and equipment pads to loading zones and bus lanes. We prepare the base, form, place and finish, and pour large areas in stages so the site keeps running.
Open 24 hours, 7 days a week · Mississauga and the GTA
What we pour
- Equipment, generator and transformer pads
- Garbage enclosure and bin pads
- Shed, garage and workshop slabs
- Patios and landings
- Loading zones, bus lanes and other heavy-duty paving
- Slab infill after trenching or equipment changes
Built for the load
A slab is only as good as what is under it. We excavate to firm ground, place and compact a granular base, and set forms to grade. Thickness and reinforcement, whether wire mesh or rebar, follow your drawings. Slabs that carry trucks get thickened edges where the design calls for them.
Concrete shrinks as it cures, so we plan the joint layout before the pour and cut the joints on time. Outdoor slabs get a broom finish for grip. Indoor slabs get a trowel finish.
Staged pours
On a working site we pour in sections, so trucks, buses and people can still get through. Where a ready-mix truck cannot reach, we place with buggies or a pump.
What affects the price
Area, thickness, reinforcement, access, what has to be removed, and how many stages the pour needs. Small pads can carry a short-load charge from the ready-mix supplier, which we show on the quote.
Inside a heavy-duty slab
What you see is the finish. What carries the load is below it.
- Thickened edgeExtra depth where loads are highest, when the design calls for it.
- ReinforcementWire mesh or rebar, placed as shown on your drawings.
- Control jointsCut on time, so cracks follow the joints.
- Compacted granular baseEven support under the whole slab.
- Firm subgradeSoft or wet ground is dug out before the base goes in.
Thickness, concrete strength, joint spacing and slopes follow your project's drawings and specifications.
Photos from recent jobs
Slabs & Pads work we have completed.
Questions about slabs and pads
Short answers. Your quote covers the details for your site.
How thick should my slab be?
It depends on the load. A shed pad is thinner than a slab that carries trucks. For anything structural or heavily loaded, we build to drawings from an engineer.
When can vehicles drive on a new slab?
As a general guide, cars after about 7 days, with full strength at 28 days. Heavy trucks may need longer. We confirm the timing for your mix.
Do you provide engineering?
No. We build to your drawings and work with your engineer or designer.
Where we do this work
We are based in Mississauga and work across the Greater Toronto Area. Pick your town for local details.
Related services
Often done on the same visit.
- Trench Drains & Channels→Trench drain channels set to line and grade, encased in concrete and finished flush with the slab.
- Curbs & Gutters→Curb and gutter formed and poured to municipal and project specifications, including OPSD details.
- Saw Cutting & Joint Sealing→Control joints cut on time, expansion joints placed and joints sealed, so cracks stay where they belong.
- Forming, Placing & Finishing→Formwork set to line and grade, concrete placed, and broom, hand-trowel or power-trowel finishes.
Request a quote
Tell us about the job and we will get back to you with a written quote. The service is already selected for you.